Follow the building construction.
Find out where we sourced materials and who did what, when and why.
Summer 2024. Foul and surface water drainage going well.
Summer 2024.
Lovely chunky locally sourced sweet chestnut cladding beautifully installed by Dave and Harvey!
Summer 2024. Installing PAVAFLEX wood fibre insulation to the workshop. Supplied by Unity Lime Products.
Summer 2024.
The windrows of hay at Low Barn Meadows this year.
August 2024.
Rebuilding the top of the brick cow shed gable and pad stones to pick up existing concrete purlins.
2nd July 2024. Our photovoltaic panel installation by Dan and James with Ian and Scott from Off Grid Engineering Ltd.
April 2024. The workshop structure is nearly complete. This south facing roof will take the 18kwh/peak PV array.
28th February 2024. 200m ducting for our fibre optic cable is nearly complete so we won't be adding new telegraph poles into the landscape.
3rd January 2024.
Our new barn owl box is up. Part of our plans to encourage a net gain for ecology on site.
2nd January 2024. Happy New Year. The floodplain meadows after another night of rain.